Earlier creates better options
The best time to discuss connected systems is while architectural and electrical drawings can still change. Keypad locations, curtain provision, equipment space, wireless coverage and cable pathways can then be resolved cleanly.
Early involvement does not require every product choice to be final. It creates a coordinated foundation so later decisions remain practical.
Bring the right information
Floor plans, electrical drawings, room use, finish intent and the project programme are useful starting points. Never send passwords, alarm codes, door codes or detailed security layouts through a public enquiry form.

